Al Sukar Bridge has been destroyed by Levant during their governance. The aim of the project is the renovation of the destroyed bridge as per the agreement of UNDP with the Provincial Council and Governor for Public Works and Light Infrastructure Rehabilitation.
Bridge is two sided that consist of 3 span each side, in total 6 span both way, each span length is 20Lm , in total 60Lm, the overall bridge width is 28m, 14 m each side and the bridge is almost 80% damaged. In this project Creative Design & Construction was responsible for all disciplines of application projects such as Architectural,mechanical,electrical,sanitary,civil engineering and design services.